- News>
- Railways
Delhi-Meerut Rapid Rail: First RRTS Trainset to be handed over on May 7
India`s First RRTS trains are ready to be handed over to NCRTC; these trainsets will be brought on the large trailers to the Duhai depot being developed at Ghaziabad at a rapid pace for the Delhi - Ghaziabad - Meerut RRTS corridor.
Highlights
- Alstom will hand over these trains to NCRTC on 7 May 2022
- A total of 210 cars for the first RRTS corridor will be delivered
- The Priority Section between Sahibabad to Duhai is targeted to be commissioned by 2023
The first trainset of India’s First RRTS corridor is ready. It will be handed over to NCRTC on 7 May 2022 in a function to be held in the presence of the Secretary, Ministry of Housing and Urban Affairs, Govt. of India. Under the Make in India initiative, 100 per cent of these state-of-the-art RRTS train sets are being manufactured in India at the Alstom’s factory in Savli, Gujarat.
After the handing over of the trains to NCRTC by Alstom, these trainsets will be brought on the large trailers to the Duhai depot being developed at Ghaziabad at a rapid pace for the Delhi – Ghaziabad – Meerut RRTS corridor. All facilities of operation and maintenance of these trainsets are nearing completion at this depot.
A ceremony of handing over the manufactured trainsets to NCRTC is being organised at the manufacturing plant of Alstom (earlier Bombardier) on Saturday, where the keys of the RRTS trainsets will be handed over to NCRTC.
Also read: Hyderabad MMTS: Good news for passengers, ticket prices reduced by 50 percent from today
The interiors, along with the commuter-centric features of India’s first RRTS trains, have recently unveiled on March 16, 2022, at the Duhai Depot, Ghaziabad. These RRTS trains will be the fastest trains in India, with a design speed of 180km/h, the operational speed of 160km/h and an average speed of 100 km /h.
The modern RRTS trains will have ergonomically designed 2x2 transverse cushioned seating, wide standing space, luggage racks, CCTV cameras, laptop/mobile charging facility, dynamic route maps, auto control ambient lighting system, Heating Ventilation and Air Conditioning System (HVAC) and other amenities. The air-conditioned RRTS trains will have Standard as well as Premium class (one coach per train) along with one coach reserved for women commuters.
The manufacturing facility at Savli will be delivering a total of 210 cars for the first RRTS corridor. This includes trainsets for operating regional transit services on the Delhi-Ghaziabad-Meerut corridor and for local transit services in Meerut
The construction work on the RRTS corridor is going on full swing. After the arrival of the trains, initial trial runs are expected to commence on the priority section by the end of this year. The 17 km Priority Section between Sahibabad to Duhai is targeted to be commissioned by 2023 and the entire corridor by 2025.