To make commuting better and safer for the suburban passengers in Mumbai, a new Foot-over-bridge (FOB) was commissioned by the Mumbai Railway Vikas Corporation (MRVC) at Charni Road Station on Western Railway (WR).
“Strengthening Rail Infrastructure! For the comfort and convenience of passengers, a new Foot Over Bridge, linkway, and an elevated Booking Office has been commissioned at the Charni Road Station of Mumbai Suburban, Western Railway. #Infra4India” read the tweet of the Ministry of Railways.
“The new FOB at Charni Road is 36 meters long and 6 meters wide. It connects Platform no. 1 to the East of MCGM Skywalk and Platform no. 4. Apart from this, a 9-meter long linkway with an elevated Booking office has been provided at Platform no. 1. The total cost is estimated at Rs 4.05 crore,” a Railways official said.
Read also: Indian Railways announces Summer Special trains, check full schedule here
Meanwhile, another FOB was inaugurated at Vile Parle Railway station. “It is 55 meters long and 6 meters wide. It connects Eastside modified staircase and Platform no 1 as well as Northside old FOB above platform numbers 1-6,” said an MRVC official. He further said that the construction was completed within 6 months and it costs around Rs 2.8 crores.
Strengthening Rail Infrastructure!
— Ministry of Railways (@RailMinIndia) April 2, 2022
For the comfort and convenience of passengers a new Foot Over Bridge, linkway and an elevated Booking Office have been commissioned at the Charni Road Station of Mumbai Suburban, Western Railway.#Infra4India pic.twitter.com/jQJi5bBrjr
In the financial year 2021-22, 10 FOBs have been commissioned in the Mumbai suburban section of Western Railways. “Four more FOBs: Grant Road North FOB, Bandra North FOB, Dahisar North FOB, Vasai Road South, and Bhayandar South FOB are planned to be completed soon,” an official at WR said.
Stay informed on all the latest news, real-time breaking news updates, and follow all the important headlines in india news and world News on Zee News.